Description: The supply of the penitentiary is achieved through two distant pumping stations which communicate each other via text messages through GSM network. The operation of the pumping station is fully automated while there is the possibility to intervene and control the operation, and the errors they might occur, via mobile phone.
Equipment Features
- 3 Siemens PLC S7-200 units with GSM Modem's
- 2 ABB Inverters for the control of the pumps