Description: This system is one central automated switchboard which has a PLC S7-300 installed with which we have total control of the project. We also have control of the 4 local sub-switchboards which collect data from the individual equipment through distant, entrance-exit, units connected to the main PLC through Ethernet network. In cooperation with the main computer which has SCADA distant control system we achieve total control of the project plus we can record every data.
Equipment Features
- 1 Siemens PLC S7-300 unit
- 4 Siemens Remote I/O
- 1 PC with Siemens SCADA WinCC Flexible