BESS Project for Battery Energy Storage System Facility in UK – Longridge 50MW

BESS Project for Battery Energy Storage System Facility in UK – Longridge 50MW

SENEKIS LTD was tasked with Supply & Services for 1100V 80kA/1s DC & Aux AC equipment for 50MW battery storage project called 'Longridge’, installed in Twenty-two (22) 40’ Battery containers.

We adhered to a strict delivery time plan within 90 days including on site workmanship for On time delivery, Tests & BS certifications.

Equipment & materials included:

132 switchboards PLC controlled, 440m busducts, 40tn Airfreight express material deliveries, 11000 terminals, 100km copper cables & 8tn Aluminium busbars.

 

Technology used :

Elsteel Techno Module DC panels and Busducts (Elsteel Special design and development in cooperation with SENEKIS), Siemens S71200,  LSIS DC switch disconnectors, Raycap DC spd’s. 

 

Apart from this  we already delivered  six  projects and  two similar projects are already under development.