Generator management and surveillance of the substation the control room at Flamingo Casino, F.Y.R.O.M

Transfer PPC with 2 transformers

Generator management and surveillance of the substation the control room at Flamingo Casino,  F.Y.R.O.M

Description: This system is one automated switchboard with main ACB breakers that every transfer needs and has a S7-200 PLC plus a WinCC Flexible surveillance system connected to the PLC via profibus. In case that one transformer fails, an instruction is given so that the substitute can take over its circuits. In case something happens and the substitute also fails, an instruction is given to close the coupler breaker in order to feed the power circuits from the generator. This system gives us the opportunity to choose between main, substitute and third transformer, as well as total information in case of an error.

Equipment Features

  • 1 Siemens S7-200 PLC unit
  • 1 PC with Siemens WinCC Flexible  application